Friday, November 5, 2010

Sidewalks poured




Concrete sidewalks have been poured along East Street, Commerce Street, and the service alley to the west of the building.  A ribbon of brick pavers will separate the East Street and Commerce Street sidewalks from the curb.  The main entrance to the building is reached via a pedestrian plaza of non permeable pavers.

No comments:

Post a Comment